POURING THE FUTURE WITH PRIDE, PERFORMANCE & VALUE

Cutting Edge pours laser-level footings, walls, and slabs that keep framers smiling and schedules bullet-proof.

Trusted by builders, developers & homeowners

EXCELLENCE CAST IN CONCRETE

number

Years of Salt Lake Craftsmanship

0
1
0
1.
1
2
0
1
0
1
k
+
foundations & slabs placed
0
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
0
1
2
3
4
5
1
2
3
4
%
pours delivered on schedule
8
9
0
6
1
2
0
1
5
1
0
1
0
1
+
properties supported by our pours

YOUR FOUNDATION, FORMED WITH CARE & EXPERTISE

From first form board to final trowel pass, we pour to laser-level accuracy, cure under strict specs, and deliver concrete that stays true for a lifetime.

Production-Build Footings & Walls

Continuous crews, rebar tied tight, elevations held within ¼″. |

Slabs, Driveways & Patios

Laser-screeded, trowel-smooth, ready for framers and finishers.

Commercial & Residential Pads

High-PSI mixes, dense rebar grids, anchor bolts set dead-level.

frequently asked questions

01
What mix design do you recommend?
We match PSI, slump, and admixtures to your engineering report, which factors in items like; frost depth, and load path. Most residential footings run 3,000–3,500 PSI; commercial pads climb to 4,000 +.
02
How long does a concrete phase take?
Typical production homes: two days form & steel, one day pour, seven day cure. Weather and inspections can shift that by a day either way.
03
How do I pick the right concrete contractor?
Ask for current on-time stats, level-check data, and builder references. We share all three up front—and invite you to walk any of our job sites.
04
Can you pour in bad weather?
Yes—heated blankets, accelerators, or a strategic pause keep strength on target. We never trade durability for speed.

READY TO LOCK IN A TRUE FOUNDATION?

Upload your plans today and receive a line-item quote within two business days.

submit now
submit now
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.